Detailed design of a hydrogen metering unit at a thermal power plant.
The metering unit (CU) is installed on the hydrogen pipeline between the electrolysis room and the CHP turbine generator.
The control unit is created on the basis of an ultrasonic flow meter with an OPTISONIC 7000 primary converter, with the addition of standard instrumentation and control equipment.
The composition of the ATC section for the hydrogen accounting system:
- Common data.
- Scheme of automation.
- Connection diagram of external electrical and pipe wiring.
- Table of connections.
- Plan of cable lines on the site.
- Plan of cable lines in the control room.