Accounting for outages in electricity

Baza data "Accounting for automatic disconnection in electrical distribution networks" - keeping 6-110 kV overhead line outages base in structural division of the network organization, associated with damage to the overhead line and disables the protection RZA. By disabling all the information is entered (from the date of origination and until full recovery of damage). It is possible to calculate the number of disconnected short circuit connection switch for timely maintenance outages after exceeding the norm. Formation of summary reports for the period by outages in the context of structural units, substations.
demo: http://my-files.ru/orz2pw