Heating and ventilation project for a repair block

Sold 0
Refunds 0
Good feedbacks 0
Bad feedbacks 0

Project of heating and ventilation of the building of the repair and maintenance unit (REB) and the built-in boiler room:
- General data.
- Heating. Plan at elevation 0.000, 3.300.
- Heating. Heating system diagram. Unit 1 2, 3.
- Heating. Control unit.
- Ventilation. Plan at elevation 0.000, 3.300.
- Ventilation. Roof plan at elevation 6.600. Diagrams of systems BE7-BE40.
- Ventilation. Diagrams of systems P1-P4-, B1-B7, BE1-BE6, BE41.
- Ventilation. Fragment of plan at elevation 0.000, 3.300. Section 1-1, 2-2, 3-3, 4-4.
- Ventilation. Fragment of plan at elevation 0.000, 3.300. Heat supply scheme of heaters.
- Input of heat network. Fragment of plan at mark. 0.000. Section 1-1.

File format: dwg, tif (AutoCAD 2010 not editable)
Note: source files of format *.tif must be in the same folder with the project file *.dwg

Download file «Project of heating and ventilation of repair block» >>>

Tags: gas compressor station, REB